return link

MoDOT Area Road Work For Week of Aug. 24, 2020

Aug 21, 2020 | Headline News

Area road work planned by the Missouri Department of Transportation during the week of Aug. 24 includes:
Grundy County – Highway 6 sidewalk and utility work in Trenton from Fourth Street to the Muddy Creek Bridge through August (includes Saturday work); Highway 6 resurfacing project from the Muddy Creek Bridge, east of Trenton to I-35 (Daviess County) through early September.
Daviess County – Highway 6 esurfacing project from I-35 to the Muddy Creek Bridge, east of Trenton, (Grundy County) through late August; I-35 resurfacing project from Route C (Exit 78) to Highway 136 (Exit 92, Harrison County) through September; Highway 190 scrub seal project from the Grundy County line to Route F, Aug. 24 (flaggers and a pilot car will guide motorists around the work zone); Route V pothole patching, Aug. 24-25; Route F drainage work from Highway 6 to Highway 190, Aug. 25-26; Route V scrub seal project from Highway 6 to Highway 190, Aug. 25-26 (flaggers and a pilot car will guide motorists around the work zone); Route K pothole patching, Aug. 25 -27; Highway 190 scrub seal project from Route V to Highway 65 (Livingston County), Aug. 27-28; Route P pothole patching, Aug. 28.
Harrison County – Route A closed until further notice from Route T to Route B due to a culvert washout; I-35 resurfacing project from Highway 136 (Exit 92) to Route C (Exit 78, Daviess County) through September; Route Y pothole patching from Route T to 1 mile east of Route T, Aug. 24; Route MM pothole patching from Highway 146 to Route CC, Aug. 25; Route F pothole patching from Route W to Route D, Aug. 26.
Livingston County – Highway 190 bridge rehabilitation project over the Thompson River – a traffic switch will take place on Monday, Aug. 24 to allow the contractor to work on the other half of the bridge (the bridge rehabilitation project is expected to continue through late November a 10-foot width restriction is in place); Highway 65 bridge rehabilitation project over the Grand River through mid-December (an 11.5-foot width restriction is in place).
Sullivan County – Route N closed for a culvert replacement project 0.2 miles west of Route B near Green City through mid-September; Route PP closed for a bridge replacement project over East Medicine Creek through the end of the year; Route YY pothole patching, Aug. 24-26


This website brought to you in part by the following sponsor:

 

Find out how to advertise here – Email us! [email protected]